Effective:
Mar 20, 2017 to Apr 2, 2017

yes

Beginning with the start of service on Monday, March 20, 2017 through end of service on Sunday, April 2, 2017, all westbound Red Line and Waterfront Line trains through Tower City will again use the Auxiliary Track 7 platform as crews work to replace a track switch.

The entrance to the Auxiliary Track 7 is located on Level 3 of Tower City, next to Victoria’s Secret. This platform is ADA accessible.

During this time, all eastbound Red, Blue, Green and Waterfront Line trains will board/alight at their normal locations within Tower City station.

Regular rail service will resume through Tower City with the start of service on Monday, April 3.

RTA apologizes for the inconvenience as this necessary work is completed.

Major Stations

Plan a Trip

Via Google Transit
(e.g. Hopkins Airport) Get current location
(e.g. Rivergate Park)
 :  

Map
Directions
Directions
Close Trip Panel
Suggested Routes
 
Service Alerts
 
 
 
 
 
 

Date Field